ACP is experienced in finding alternative solutions that offer your projects the same functionality and quality at a better value.
We call it Value Engineering.
See how ACP can save you time and money on your projects without sacrificing quality or functionality.
West Australian mining giant Alcoa has recently relocated its Willowdale bauxite mine site from the 20 year old Orion location to a new location known as Larego. This challenging move included the safe relocation of an 850 metric tonne crusher to the new area, set to be the centre of the mine’s operations for the coming decades.
Twin Super-Cor Arches with MSE Structural Walls, cobblestone face
Australian Construction Products (ACP) was engaged to design and supply over 500m of Multi-PlateTM Horseshoe HA42 Arch Reclaim Tunnel with approximately 500m2 of associated headwalls utilising our proprietary ACP Wall Systems with precast concrete facing panels
To deliver this attractive feature, the contractor needed an efficient retaining wall solution and ACP was able to assist, adding value by seamlessly embedding our product into the design and helping with a precast workflow to speed up production.
AIL’s Grid-StripTM System represents the most significant improvement to the design and construction efficiency of MSE walls in decades. With its standardized width, the Grid-StripTM System makes all types of MSE Retaining Wall Systems easier to design and construct – saving valuable time and money on projects.