Project Categories

Engineered Tunnels for Alcoa’s Willowdale Bauxite Mine

West Australian mining giant Alcoa has recently relocated its Willowdale bauxite mine site from the 20 year old Orion location to a new location known as Larego. This challenging move included the safe relocation of an 850 metric tonne crusher to the new area, set to be the centre of the mine’s operations for the coming decades.

Gunnedah TLO, reclaim tunnel system

Multi-Plate offers distinct advantages including: high strength to weight ratio / a wide range of shapes and sizes / easy handling and shipping / economical / can be pre-assembled or assembled on site.

Wodonga Rail Bypass, railway over local road

This project improved the efficiency of the main rail line between Sydney and Melbourne. The project involved constructing a 5 km dual track rail bypass of Wodonga, and included a new train station, seven bridges, and this arch.

Boggabri Truck Dump Station, conveyor overpass

Australian Construction Products (ACP) worked closely with the stakeholders, Nepean Conveyors and the consultants, Lindsay & Dynan. Project urgency required a prompt response to come up with a solution to the awkward challenge of the steep decline and the conveyor skew alignment.