Currabubula Underbridge, railway over creek

Project Details
Owner: Australian Rail Track Corporation
Consultant: URS Australia
Contractor: ARTC assigned to their local works sub-contractor
Location: Currabubula 424.327km, Werris Creek, New South Wales, Australia

Project Scope

Manufacture and delivery of Multi-Plate Arch Type EA for creek crossing

Project Notes

  • Multi-Plate Arch Type 31EA-11 Hot Dip Galvanised steel finish
  • 25.9m long, 4.583m span x 4.874m high arch
  • Had to be built between existing brickwork bridge piers and just fit under old girders.
  • This arch was manufactured then delivered within the required delivery schedule

Multi-Plate offers distinct advantages including: high strength to weight ratio / a wide range of shapes and sizes / easy handling and shipping / economical / can be pre-assembled or assembled on site.

Please contact us to discuss your specific project requirements.