Boggabri Truck Dump Station, conveyor overpass

Australian Construction Products (ACP) worked closely with the stakeholders, Nepean Conveyors and the consultants, Lindsay & Dynan. Project urgency required a prompt response to come up with a solution to the awkward challenge of the steep decline and the conveyor skew alignment.

Telerah Rail Overbridge

The ARTC needed to replace a timber beam rail overbridge in a hurry, they chose Super.Cor Arch. A quick and effective construction solution was required to minimise street disruption and get the rail line running again.

Stratford Coal, reclaim tunnel

ACP manufacture and delivered a Multi-Plate Arch Type AB for reclaim conveyor for a project based at Gloucester Coal in Stratford NSW. These arches were manufactures then delivered within the delivery schedule.

Services Crossing, Perimeter Road, Olympic Dam

A project at Olympic Dam, SA where ACP manufactured and delivered of Multi-Plate Arch Type AB for Perimeter Road Overpass. The arch was designed, manufactured and supplied to site within a very tight lead time of only eight weeks

Nammuldi Mine

This project called for ACP to manufacture and deliver Super-Cor Arches HA68S and SC54S for Heavy Haul Road Crossings in the Pilbara region, WA. The design incorporated strain gauges, pressure plates and a data logger to the exterior of the rail tunnel.

Mangoola Coal Mine

Australian Construction Products (ACP) was engaged to design and supply over 500m of Multi-PlateTM Horseshoe HA42 Arch Reclaim Tunnel with approximately 500m2 of associated headwalls utilising our proprietary ACP Wall Systems with precast concrete facing panels

Kanmantoo Copper and Gold Project

Check out this project where ACP had to design, manufacture and supply a 84.7m reclaim tunnel, consisting of Hel-CorTM and Multi-PlateTM pipes near Adelaide Hills, SA. The bulkheads were designed and supplied to allow for smooth transition from larger tunnel into smaller tunnel.

ACP wins Pacific Highway projects – Kempsey Bypass, NSW

Through competitive pricing and solid ongoing relationships with key contractors, ACP has won a succession of contracts to supply a number of road projects along the Pacific Highway. The Pacific Highway is maintained by New South Wales Roads and Maritime Services and stretches 1,000 kilometres between Sydney and Brisbane. Kempsey Bypass The $618 million, 14.5 […]

NEW – X-350 Terminal End installation video now available

To ensure installers have all the necessary information when installing X-350 Terminal End system, we have a new version of the installation video. The new video is clearer and easier to follow. One important improvement is the installers are now complying to current Health and Safety procedures. Fully redirective terminal end for steel guard barrier […]

Merger of Australian Construction Products and Safe Direction

We are delighted to announce the merger of Safe Direction Pty Ltd and Australian Construction Products Pty Ltd (ACP).
On 1 May 2023 Jaybro, Australia’s leading supplier to the civil construction and infrastructure sector, and owner of ACP, purchased 100% of the share capital of Safe Direction. Under Jaybro’s ownership the two businesses will be merged to form Australia’s preeminent company manufacturing and supplying vehicle barrier systems.

A compelling motivation for the merger is the value created for our customers from combining the collective resources and knowledge of the two companies. Notably there will be significant broadening of the product range and enhancement to distribution reach and capacity. There will be transitionary steps as the two businesses assemble under the one entity, Safe Direction. Part of this transition includes the consolidation of the products and services offered by the merged business into a single web domain www.safedirection.com.au

We trust that this merger will provide increased value to you and we look forward to the opportunity to be of assistance.