To ensure installers have all the necessary information when installing X-350 Terminal End system, we have a new version of the installation video.
The new video is clearer and easier to follow. One important improvement is the installers are now complying to current Health and Safety procedures.
Fully redirective terminal end for steel guard barrier systems, using minimal parts.
PPE: Installers must wear Safety clothing including high visibility vests, steel-capped footwear, gloves, hard hats and safety glasses.
Pre-Installation: Locate Underground services before installing posts. Only Authorised personnel are to operate machinery. Take care to avoid overhead hazards when using overhead machinery. Lay out all materials required for installation.
Installation Guide
1. Install Blockouts, ground strut and soil anchor. Using the ground strut as a template and ensure post bolt notches are facing up and facing the soil anchor.
2. Install the rail and cable anchor Bracket. Place cable anchor bracket at back of the rail. Attach rails to post and blackout.
3. Attach slider bracket and slider panel and install rails 1+2. Nuts bolted on traffic face of the rail
4. Install the impact head end of rail 1, place bottom two bolts first then use a crowbar to lever the rails snug onto the rail.
5. Install the cables: Other workers stand clear from this process to avoid hazards.
6. Turn friction plate and tighten the cables. Do not tighten cables at the front of the soil anchor.
7. Attach yellow nose cone. Place on impact head.
Delineation can be attached to suit local road controlling authorities’ requirements.