Project Details
Owner: Idemitzu Australia Resources Pty Ltd
Consultant: Lindsay & Dynan Pty Ltd
Contractor: Daracon Group
Location: Boggabri, New South Wales
Project Scope
Manufacture and delivery of Multi-Plate Arch Type HA for conveyor Overpass
Project Notes
- Multi-Plate Arch Type HA (Galvanised, 5mm sheet thickness) Hot Dip Galvanised steel finish
- 23.7m long, 4.9m span x 3.7m high arch
- Skew & Bevel cut ends to suit conveyor gradient
- The arch end treatment comprised a concrete ring beam
- These structures are designed in accordance with AS 5100 and AS/NZS2041:1998
- This arch was manufactured in Townsville and delivered within the required delivery schedule
Australian Construction Products (ACP) worked closely with the stakeholders, Nepean Conveyors and the consultants, Lindsay & Dynan. Project urgency required a prompt response to come up with a solution to the awkward challenge of the steep decline and the conveyor skew alignment.
The un-usual heavy Quad-Quad B Live Load was a key design feature and therefore Multi-Plate was specified as it can easily accommodate high loads.
Daracon Group had a tight lead time for design and supply that was 100% completed in 6 weeks.
Multi-Plate offers distinct advantages including: high strength to weight ratio / a wide range of shapes and sizes / easy handling and shipping / economical / can be pre-assembled or assembled on site.
Please contact us to discuss your specific project requirements.