Project Details
Owner: BHP Billiton
Consultant: Aker Solutions
Contractor: Lucas Earthmovers Pty Ltd
Location: Olympic Dam, South Australia
Project Scope
Manufacture and delivery of Multi-Plate Arch Type AB for Perimeter Road Overpass
Project Notes
- Multi-Plate Type AB Half Circle Arch, Hot Dip Galvanised steel finish
- 38.7m long, 6.5m span x 3.1m high
- Square vertical ends to suit embankment conditions
- The arch end treatment comprised a concrete toe wall and concrete batter facing
- Structures are designed in accordance with AS 5100 and AS/NZS2041:1998
- The arch was designed, manufactured and supplied to site within a very tight lead time of only eight weeks
Multi-Plate offers distinct advantages including: high strength to weight ratio / a wide range of shapes and sizes / easy handling and shipping / economical / can be pre-assembled or assembled on site.
Please contact us to discuss your specific project requirements.